Skip to content
CurveScout

CURVESCOUT / MOTORCYCLE RIDE

Tinggi Bridge and Coal Storage starting at Bukittinggi

Plan this ride

Recorded distance
343 km
Riding-time estimate
5 h 27
Journey
Recorded itinerary
Distance and timing basis

Ordered leg totals agree within rounding. Stop distances are approximate sums of rounded legs. Stops, delays, approach and any separate return travel add time. Basis: producer-declared routed record.

Reading history stays on this device. My road watch requires a separate selection; opening it does not subscribe this ride.

Distance and riding time are measured on the routed road. Check local closures and conditions before you ride.

Open this ride in CurveScout

Why this ride

From Bukittinggi it runs 343 km to Bukittinggi; allow about 5 h 27 of riding. On the way it passes Salak Power Plant and Ranith Water Pumping, Coal Storage and back through Salak Power Plant and Ranith Water Pumping. The stored terrain estimate reaches about 800 m; a measured road-elevation profile is not available. The line favours views over speed.

Waypoint introductions and full write-ups

  1. 1. Tinggi Bridge

    Sumatra's western highlands are the home of the Minangkabau, a matrilineal people whose houses have roofs curved like buffalo horns, and the road up from the coast at Padang to the cool plateau around Bukittinggi is one of the great short climbs in Indonesia. It passes through the Anai valley, past a waterfall that falls close to the roadside, and through the little railway halt of Kayu Tanam, where the old line from Padang once began its steep ascent on its way to the Ombilin coal fields. That railway, built by the Dutch in the late nineteenth century with a rack section to climb the grade, is now part of the UNESCO-listed Ombilin Coal Mining Heritage of Sawahlunto.

    Read the complete Tinggi Bridge write-up.

    Recorded stop-planning note

    May refer to an earlier itinerary; verify against your selected route before riding.

    Planning note

    Tinggi Bridge is where the day begins. Next is Salak Power Plant and Ranith Water Pumping.

  2. 2. Salak Power Plant and Ranith Water Pumping

    Coal built this corner of West Sumatra, and the buildings at Salak and the Ranith pumping station are part of the machinery that moved it. The Dutch colonial government developed the Ombilin coalfield after a geologist found rich seams near Sawahlunto in the nineteenth century, and the whole system of mine, railway, power plant and port was later recognised by UNESCO as the Ombilin Coal Mining Heritage of Sawahlunto. A power station gave the mines electricity, and a pumping station supplied water, because a steam age needs both.

    Read the complete Salak Power Plant and Ranith Water Pumping write-up.

    Recorded stop-planning note

    May refer to an earlier itinerary; verify against your selected route before riding.

    Planning note

    Salak Power Plant and Ranith Water Pumping comes up about 70 km into the recorded legs. Next is Coal Storage.

  3. 3. Coal Storage

    Coal needs a harbour, and for the Ombilin mines the harbour was at Padang, on Sumatra's west coast, about five kilometres from the site. The Dutch built a deep-water port in the bay south of the town, naming it Emmahaven after the queen consort, and the railway from Sawahlunto ended here at the quay and the storage yards. Today the port is known as Teluk Bayur, and some of the old coal-handling structures can still be seen.

    Read the complete Coal Storage write-up.

    Recorded stop-planning note

    May refer to an earlier itinerary; verify against your selected route before riding.

    Planning note

    about 171 km into the recorded legs you reach Coal Storage. Next is back through Salak Power Plant and Ranith Water Pumping.

  4. 4. back through Salak Power Plant and Ranith Water Pumping

    Return visit. Read the place description above.

    Read the complete Salak Power Plant and Ranith Water Pumping write-up.

    Recorded stop-planning note

    May refer to an earlier itinerary; verify against your selected route before riding.

    Planning note

    back through Salak Power Plant and Ranith Water Pumping, late in the day. Next is Tinggi Bridge.

  5. 5. Tinggi Bridge

    Return visit. Read the place description above.

    Read the complete Tinggi Bridge write-up.

    Recorded stop-planning note

    May refer to an earlier itinerary; verify against your selected route before riding.

    Planning note

    Back at Tinggi Bridge. That is the ride.

Leg by leg

Tinggi Bridge to Salak Power Plant and Ranith Water Pumping

Tinggi Bridge → Salak Power Plant and Ranith Water Pumping is 70 km of rhythm rather than effort. Let it flow and let the view breathe.

Salak Power Plant and Ranith Water Pumping to Coal Storage

Salak Power Plant and Ranith Water Pumping → Coal Storage is 101 km of getting across. Ride it tidily and keep the enthusiasm for what comes after.

Coal Storage to back through Salak Power Plant and Ranith Water Pumping

Coal Storage → back through Salak Power Plant and Ranith Water Pumping is 100 km of getting across. Ride it tidily and keep the enthusiasm for what comes after.

back through Salak Power Plant and Ranith Water Pumping to Tinggi Bridge

back through Salak Power Plant and Ranith Water Pumping → Tinggi Bridge is 72 km of rhythm rather than effort. Let it flow and let the view breathe.

More motorcycle rides nearby