Tinggi Bridge and Salak Power Plant and Ranith Water Pumping
Plan this ride
Recorded distance
286 km
Riding-time estimate
4 h 33
Journey
Recorded itinerary
Distance and timing basis
Ordered leg totals agree within rounding. Stop distances are approximate sums of rounded legs. Stops, delays, approach and any separate return travel add time. Basis: producer-declared routed record.
Reading history stays on this device. My road watch requires a separate selection; opening it does not subscribe this ride.
Distance and riding time are measured on the routed road. Check local closures and conditions before you ride.
286 km from Bukittinggi to Bukittinggi, about 4 h 33 of riding. It goes by way of Batu Tabal Train Station, Kayu Tanam Train Station, Salak Power Plant and Ranith Water Pumping and back through Kayu Tanam Train Station. The stored terrain estimate reaches about 800 m; a measured road-elevation profile is not available.
Waypoint introductions and full write-ups
1. Tinggi Bridge
Sumatra's western highlands are the home of the Minangkabau, a matrilineal people whose houses have roofs curved like buffalo horns, and the road up from the coast at Padang to the cool plateau around Bukittinggi is one of the great short climbs in Indonesia. It passes through the Anai valley, past a waterfall that falls close to the roadside, and through the little railway halt of Kayu Tanam, where the old line from Padang once began its steep ascent on its way to the Ombilin coal fields. That railway, built by the Dutch in the late nineteenth century with a rack section to climb the grade, is now part of the UNESCO-listed Ombilin Coal Mining Heritage of Sawahlunto.
May refer to an earlier itinerary; verify against your selected route before riding.
Planning note
Tinggi Bridge is where the day begins. Next is Batu Tabal Train Station.
2. Batu Tabal Train Station
High in the mountains of West Sumatra, a railway line built by the Dutch in the late nineteenth century snakes between volcanoes, lakes and rice terraces. It was laid to carry coal from the mines of Sawahlunto down to the port of Padang, and the whole system, mines, company town and railway, forms the Ombilin Coal Mining Heritage of Sawahlunto, listed by UNESCO in 2019. Batu Tabal is one of the small stations along the route, near the shores of Lake Singkarak, where the line runs right along the water's edge.
May refer to an earlier itinerary; verify against your selected route before riding.
Planning note
Batu Tabal Train Station comes up about 24 km into the recorded legs. Next is Kayu Tanam Train Station.
3. Kayu Tanam Train Station
Kayu Tanam is a small mountain-foot town on the old road and railway between Padang and the highlands of West Sumatra, the place where the flat coastal plain gives up and the Bukit Barisan range begins. The station is a relic of the Dutch era, when the colonial railway pushed inland to bring coal from the Ombilin mines at Sawahlunto down to the port at Padang. The line climbed the steep Anai gorge and, higher up, used a toothed rack rail to manage the gradient, and the whole system was recognised by UNESCO in 2019 as part of the Ombilin coal mining heritage.
May refer to an earlier itinerary; verify against your selected route before riding.
Planning note
about 60 km into the recorded legs you reach Kayu Tanam Train Station. Next is Salak Power Plant and Ranith Water Pumping.
4. Salak Power Plant and Ranith Water Pumping
Coal built this corner of West Sumatra, and the buildings at Salak and the Ranith pumping station are part of the machinery that moved it. The Dutch colonial government developed the Ombilin coalfield after a geologist found rich seams near Sawahlunto in the nineteenth century, and the whole system of mine, railway, power plant and port was later recognised by UNESCO as the Ombilin Coal Mining Heritage of Sawahlunto. A power station gave the mines electricity, and a pumping station supplied water, because a steam age needs both.
May refer to an earlier itinerary; verify against your selected route before riding.
Planning note
Tinggi Bridge closes the day.
Leg by leg
Tinggi Bridge to Batu Tabal Train Station
Tinggi Bridge → Batu Tabal Train Station is 24 km of rhythm rather than effort. Let it flow and let the view breathe.
Batu Tabal Train Station to Kayu Tanam Train Station
Batu Tabal Train Station → Kayu Tanam Train Station is 36 km of rhythm rather than effort. Let it flow and let the view breathe.
Kayu Tanam Train Station to Salak Power Plant and Ranith Water Pumping
Kayu Tanam Train Station → Salak Power Plant and Ranith Water Pumping is 83 km of getting across. Ride it tidily and keep the enthusiasm for what comes after.
Salak Power Plant and Ranith Water Pumping to back through Kayu Tanam Train Station
Salak Power Plant and Ranith Water Pumping → back through Kayu Tanam Train Station is 84 km of getting across. Ride it tidily and keep the enthusiasm for what comes after.
back through Kayu Tanam Train Station to back through Batu Tabal Train Station
back through Kayu Tanam Train Station → back through Batu Tabal Train Station is 36 km of rhythm rather than effort. Let it flow and let the view breathe.
back through Batu Tabal Train Station to Tinggi Bridge
back through Batu Tabal Train Station → Tinggi Bridge is 24 km of rhythm rather than effort. Let it flow and let the view breathe.